Excellent FrameWorks
Max Jacquiard
The Loops in Rogers Pass

As originally constructed the CPR mainline through the Selkirk mountains crossed over the summit of Rogers Pass, featuring steep grades and many snowsheds to protect the line against snow slides that plagued the area.

To reduce the grade to manageable levels a series of loops was employed in the valley to the west of the summit. The eastbound train is travelling through a string of snowsheds after negotiating the loops which included four bridges as well as the one in the picture.

The completion of the Connaught tunnel under the pass in 1916 eliminated all this trackage. The new line leading to the tunnel now runs straight along the middle of the valley which is once again heavily forested. A number of stone piers that supported the bridges still stand and can be explored from the Loops campground just off the Trans Canada Highway (#1).

Canvas giclee editions...

Image size: 20" x 30".
Edition size: 60 signed and numbered prints. Issue price $600
also 25 Artist Proofs. Issue price $700.
and 10 Publisher's Proofs. Issue price $700.

Image size: 28.5" x 43".
Edition size: 60 signed and numbered prints. Issue price $1100 also 25 Artist Proofs and 15 Publisher's Proofs. Issue price $1200.

NOTE Don't be disappointed....I have only been able to get two of each size canvas!

For more information, or to order a print please send e-mail to Pacific Outlook/Excellent FrameWorks, or use the Secure Order Form.

I can also be reached at Excellent FrameWorks by phone, 250-746-7112, between 10am and 5:30pm Pacific time, Monday through Friday and between 10 and 4 on Saturdays.